AIIntegra

AI, data and management-control consultancy for SMEs. We connect operations with finance so you decide with reliable figures.

We work with
Operations managementWhere is plant efficiency being lost?

OEE by machine, stops with their cause and a digital shift log.

Laptop 1Operations management

Your plant, live, inside the laptop.

A digital twin of your lines, equipment and flows. Drag to look around.

app.aiintegra.cl/ess/planta-3dGOOperations mgmt.
Overview · 3 lines

Data rises from the plant to management.

Each level sees what it needs from the same source: no parallel spreadsheets, no competing versions of the truth.

  1. GOOperations managementlogs the shiftLaptop 1
  2. CGManagement controlvalidates against budgetLaptop 2
  3. GFFinance managementprojects cashLaptop 2
  4. GGGeneral managementdecidesLaptop 2
AIINTEGRA / ANALYTICAL CAPACITY
AI RUNNING

AI analytical capacity,
working on your data.

While management reviews its KPIs, AI goes through cash, OEE, costs and demand: it finds patterns, detects deviations and proposes the action.

AI ANALYZING / SIMULATION
CURRENT TASK
Projecting the 12-month balance
Reads collections, supplier payments and sales seasonality.
CASH FLOW01 / 06
192VARIABLES
—RELATIONSHIPS ASSESSED
0FINDINGS
TASK 01 — CASH FLOW

August falls below minimum cash (−12 MM). Action: collect 15 days earlier from the top three customers.

Conceptual representation · synthetic demo tasks, data and findings; not a trained neural network running.
Laptop 2General mgmt. · Finance · Management control

Part 2: from record to prediction.

We zoom into the laptop. With the same data, AI projects cash, controls the process, explains costs and forecasts demand.

app.aiintegra.cl/ess/flujo-cajaGFFinance management
Cash flowESS plant · synthetic data
Live · 10:07:00 PM
Projected cash flow · 12 monthsMM CLP
-40060120180240minimum cash 40JanFebMarAprMayJunJulAugSepOctNovDec
Inflows ×0.5Outflows ×0.5Cash balanceWith earlier collection
Lowest balance-12 MMAug
Months below min.4Jul · Aug · Sep · Oct
Balance with action43 MMabove minimum
Analyzed with AI · ClaudeAI reading

Move each axis to match your reality. The radar compares your situation with a reasonable 12-month goal and tells you where to start.

  • Your company today
  • 12-month goal
135Data & BICostsBudgetCash flowProject controlAutomation& AI
View as table
AxisYour company today12-month goalgap
Data & BI242
Costs242
Budget143
Cash flow242
Project control143
Automation & AI132
39%Maturity index · of goal

Where to start

  1. Budget: build and controlBudget · gap 3 levels
  2. Project control (EVM)Project control · gap 3 levels
Suggested goal for SMEs · not a market benchmark

Nine disciplines grouped in three fronts. Pick one and see what we solve.

Costs, budget, cash and monthly management: timely figures and one calculation standard.

  • Management control

    KPI model, monthly management reports and ERP-connected dashboards, with auditable data and one calculation standard across the company.

    • Power BI dashboards
    • SAP Business One
    • Management report
  • Costing

    Cost structure by product, line or project, actual versus standard costing and variance analysis with its root cause.

    • Product costing
    • Actual vs standard
    • Variance analysis
  • Budgeting: preparation & control

    Annual budget by cost center or project, with explicit assumptions, monthly tracking against actuals and re-forecasting when conditions change.

    • Annual budget
    • Actual vs budget
    • Re-forecast
  • Cash flow & projections

    12–24 month projected cash flow, scenarios and working capital, to know when and how much to finance before cash runs short.

    • Scenarios
    • Working capital
    • NPV & IRR
  1. 01Diagnostic2–3 weeks · fixed priceRoadmap and business case
  2. 02Pilot4–8 weeksMeasured pilot and scale-up criteria
  3. 03RolloutProject or retainerStable operation and a self-sufficient team

What is a plant digital twin?

A 3D model of your plant connected to real production, cost and maintenance data. It shows where efficiency is lost, lets you simulate changes and decide with evidence before investing.

How long does a diagnostic take?

Two to three weeks at a fixed price. We map the process, audit data quality and deliver a roadmap with a prioritized use case and its baseline.

What data do we need to start?

What already exists is enough: ERP exports, production and cost spreadsheets, or shift logs. If data capture is missing, we solve it with a PWA app.

Can AI make up figures?

Not in our designs. Figures are computed with verifiable rules and models; AI only writes the explanation over numbers already computed and cites the source.

Do you work with SAP Business One and Power BI?

Yes. We integrate SAP Business One (HANA), Excel, SQL and Python with data models and Power BI dashboards, with automated extraction and auditable data.

Where do you operate?

From Concepción, Chile, with projects nationwide: on-site when the process requires it and remote for the rest.

Better decisions. Simpler processes.

No cost. We leave with a savings hypothesis.

Book a 20-min diagnostic